Test Services
  • Laboratory Testing of SHS Components.
  • Field testing of SHS.
  • Testing of Solar Thermal components and system.
  • Testing of Biomass / Biogas components
  • Testing of Micro-Hydro components
more »
 
   
 
News
more »
 
   
 
   
 
   
 

Test Status

  • Test Status of Charge Controller as of 13-Feb-2012, Monday
  • Test Status of Lamp as of 13-Feb-2012, Monday
  • Test Status of Battery as of 13-Feb-2012, Monday
  • Test Status of PV Module as of 13-Feb-2012,Monday
  •  
     
    Test Schedule

    1. SHS Components

    S. No.

    Component

    Maximum Time Required

    1

    PV Module

    10 days

    2

    Charge controller

    14 days

    3

    Lamp

    45 days

    4

    Battery

    60 days


    Note:
    1. The above time schedule is for testing, data analysis and report submission.
    2. If the products to be tested are already in queue, the time required increases accordingly
    3. First preference is given to Product Introduction Test (PIT).
    4. Preference will be given to qualified companies paying test fee on subsidy based SHS.
    5. Actual time schedule for each testing and reporting will be given at the time of sample collection.
    Home | Profile | Organization Structure | Test Services | Test Status | Quality Assurance | Quality Complaince
    Field Testing | News| Photo Gallery | Downloads | Feedback | Contact Us
     
    Copyright © Renewable Energy Test Station 2007. Design & Hosted by MountDigit Technology